Overview and Objectives

new logo.png

Our proposed services to you

PROJECT OVERVIEW

Overview of information 


In Parahs 

PROJECT OBJECTIVES

Objectives of project 

Project Scope and Tasks

scope
new logo.png

PROJECT SCOPE

Overview of scope

PROJECT TASKS

List of tasks in order

ADDITIONAL OPTIONS

Additional options, such as adhoc day rates

Project Assumptions

Assumptions
new logo.png

PROJECT ASSUMPTIONS

Accommodation and travel

ESS have provided this proposal for services and tasks only. As a result, accommodation arrangements are omitted from the scope and costing. The client is responsible for arranging accommodation for the project.

Travel cost is estimated as one journey to the site at the beginning of the project and one journey returning post event completion.

Please see further project assumptions below:

  • ESS will provide services specific to the dates provided. Any additional dates that are requested by the client, ESS automatically assumes they have been signed off internally and therefore will invoice accordingly, without a PO, if one hasn't been provided. As part of this proposal you agree to accept all such additional work invoices.

  • You agree that ESS provide consultancy to you, by way of advisory conditions, either on site or during pre production. Although our consultants do not have enforcement capabilities, you, the client, agree to action any advice provided. Where advice is not followed, ESS are not held accountable.

  • You will provide necessary material that ESS require for the project's completion, including (but not limited to) site rules, key contacts, any information email or documentation specific or pertinent to the site and or event, details and documentation from specific higher risk activity such as aerial photography  RAMS, contractor details, site plans and schedules, and emergency arrangements

  • Contingency planning and arrangements are managed by you, including first aid / medical and fire provisions.

  • Where the client chooses to omit or remove pre production work, you agree to provide all relevant paperwork (ESMP, site induction, contractor documents) prior to the event, to the allocated advisor). Where this option is removed, the onsite advisor will not have had any input or time to review such docs in advance of being on site.

If any of the above information is incorrect or incomplete, please inform us immediately so the Project Scope can be revised (if necessary) 

Project Costs

Costs
new logo.png

PROJECT ESTIMATED COSTS

An outline of the costs for the services and objectives as previously outlines are estimated here as follows:

Costs 


Objective one...


Objective 2 



ADDITIONAL COSTING NOTES

This estimate is based on the clients current understanding of the Project Scope and Tasks as well as the Deliverables and Components set out in this Statement of Work.

All costs outlines are exclusive of  VAT

All invoices are due and payable within 15 days of receipt. A PO is required prior to all works being confirmed.

Ts Cs

Terms and Conditions

new logo.png

Terms of Business for services as outlined within the agreement
This is a contract between:

ESS Safety Consultants Ltd, trading as ESS Consultants ("the Company"); and you,                     

("the Client").

Company Name

Scope of Agreement

All quotes are E and O exempt.

1.0 Unless otherwise agreed, payment is strictly due on receipt of invoice for new clients and within 14 days of invoice for pre existing clients, unless otherwise agreed. Payments that are received outside of the timescale identified will be subject to additional charges per day (in the absence of any formal agreement between the client and ESS).

1.1 When delivering training, payment shall be made in advance of delivery to secure the day and prepare training materials, unless otherwise agreed.

1.2 Day Rates are based on a 10 hour day (full day rate) and 4 hours for a half day. Any work that goes beyond the identified day/ half day working hours will be charged at the relevant hourly rate, per hour (or part of) which is additional. It is the responsibility of the client to monitor and plan scheduled working hours.

1.3 The client, upon confirming work between ESS and themselves agree to monitor working hours and reimburse ESS per hour beyond the day / half day rate. ESS take no responsibility for additional costs beyond those identified in the original quote being added to the invoice where hours are increased.

1.4 Where work is confirmed to take place over 7 days consecutively,  payment may be required up front, unless otherwise agreed. Larger projects will be subject to individual agreements, which will confirm payment plans or requirements and must be singed by the client before services are provided by ESS. Please see Projects section below for further information. 

1.5 ESS are to be reimbursed travel expenses as outlined in your quote or otherwise, and may require paying in advance of travel and / or commencement of contract / event. Travel Expenses might not be included into the quote. Where this is the case, please contact ESS to confirm mileage, expenses anticipated or to discuss expenses arrangements. In the absence of client agreement, ESS will charge for expenses accordingly.

1.6 Quotes are valid for 15 days from date of receipt. Written confirmation is required prior to work taking place. Although quotes are estimated as close as possible, additional number of days or work may increase charges. It is the clients responsibility to monitor number of days used, or charges that are increasing owing to additional or unplanned work. A cancellation charge may exist if you need to cancel dates or work, please contact the office for further information if required.

1.7 ESS cannot provide any form of credit, therefore any annual services are requested for payment in full, 14 days from receipt of invoice.

Retainer Clients 

2.0 Retainers can only be provided once an agreement has been signed by the client and countersigned by ESS as the service provider. Number of days services are provided are outlined within the agreement, together with reduced day rate (where applicable - some retainer agreements may not have reduced day rates, based on the retainer level). 

2.1 Payments for retainer clients must be provided on the 1st of each month PRIOR in advance of work for the following month, or a date as specified in your agreement (or within the payment terms outlined on your invoice). Late or missing payments may result in services and access to services being withdrawn. ESS retain the right to remove all services under such conditions without prior notice to the client. 

2.2 Withdrawal from retainer agreements must be completed in the timescales as detailed within the agreement, but no less than 30 days as a minimum. Documents written on behalf of the client by the service provider will remain the intellectual property of ESS. The client may use the documents as required, and as outlined within the retainer. 

Provision of Documentation and Advice

3.0 Copyright ownership of documents produced on behalf of the client remain that of ESS Safety Consultants Ltd, T/A ESS Consultants. Where client images, logos and company names have been added to documents, this does not in any way remove the copyright ownership of supplied documents. 

3.1 Consultants are provided to clients in an advisory capacity. ESS will offer advice to clients relating to  breaches of legislation, poor working practice or work ethics and safety critical advice and planning etc. The client agrees to take action whenever / wherever necessary. In the absences of such action or support by the client, ESS retain the right to cancel any ongoing support at full project monetary cost to the client, outlining key concerns and issues together with corrective action necessary by the client. 

3.2 All documents, safety management plans, audits, quotes  and other, are produced from information provided and available at the time to ESS. All documents are produced in good faith and it is the responsibly of the client to review all documents for errors or omissions. 

Marketing  

4.0 When contracting or authorising work by ESS, you agree that your name and or logo may be used within ESS marketing material. If you DO NOT want association or logos to be used, please contact ESS.

4.1 We will endeavour to use the best or most up to date logos for the purpose of marketing material however, where an absence of such images or texts exist, ESS will obtain content from public forums. 

​Projects (seasonal, tour or longer than a week)

5.0 Project may be defined as, but not limited to; seasonal projects, events or broadcasts; a production, event or broadcast taking place longer than a week, or more than one venue. 

5.1 For events, broadcasts or work defined as a project by ESS, payment will be minimal 50% up front, or 100% up front, or via monthly instalments. Where terms and conditions are defined, the client agrees to adhere to the requirements as per individual agreements, or via the standard terms and conditions. 

5.2 For long standing projects, travel and accommodation provided on quotes are estimates only. ESS will not be held accountable for increased costs, based on availability and or expenses. The client agrees to pay any expenses either pre event, or within specific payment time scale, as defined in agreements and invoices. 

Indemnity

6.0 The Client shall indemnify and keep indemnified the ESS against any costs, claims or liabilities incurred directly or indirectly by the Company arising out of or in connection with any Assignment including (without limitation) as a result of:

(a) any breach of this Agreement by the Client; and

(b) any breach by the Client or any associated company of the Client, or any of its or their employees or agents, of any applicable statutory provisions (including, without limitation, any statutory provisions prohibiting or restricting discrimination or other inequality of opportunity); and

(c) any matter in respect of which the Client has agreed to take responsibility in clause 6.0 above.

Entire Agreement/ Variation

7.0 This Agreement constitutes the entire and only legally binding agreement between the parties relating to the assignment and replaces any previous agreements or arrangements. No variation to these terms on can be made otherwise than in writing 

Waiver

8.0 Any failure by the client to enforce at any particular time any one or more of the terms of this Agreement shall not be deemed a waiver of such rights or of the right to subsequently enforce the terms of this Agreement.

Headings

9.0 Headings contained in this Agreement are for reference purposes only and shall not affect the intended meanings of the clauses to which they relate.

Validity

10.0 If any provision, clause or part-clause of this Agreement is held to be invalid, void, illegal or otherwise unenforceable by a judicial body, the remaining provisions of this Agreement shall remain in full force and effect to the extent permitted by law.

Force Majeure

11.0 The Company shall have no liability for any delay or failure in performance of its obligations to the Client where this arises from matters outside its reasonable control.

Third Parties

12.0 No provision of this Agreement shall be enforceable by any person who is not a party to it pursuant to the Contract (Rights of Third Parties) Act 1999 (“the Act”). This does not, however, affect any right or remedy of a third party that exists or is available independently of the Act.

Overdue Debts

13.0 The Company may charge interest on all overdue debts under this Agreement at the rate of 2% per month.

Governing Law

14.0 This Agreement shall be governed by and construed in accordance with the laws of England and the parties hereby submit to the non-exclusive jurisdiction of the English Courts.  

Cancellation

15.0 Once services have been confirmed, whether verbally, electronically, in writing or by acceptance of quote, proposal or agreement, cancellation by either party is subject to the terms herein.

15.1 Both parties agree that in the event of a cancellation the provider must be informed immediately. Charges will be incurred based on cancellations timings prior to date of services or event.

15.2 Cancellation fees shall apply and are based on the following:

15.3 Where cancellation is made within 48 hours of confirmation of services, no cancellation fee is due unless the event date is within the following 7 days, in which case the full fee will be due. Where cancellation is made after 48 hours of confirmation the following shall apply:

15.4 Cancellation occurs between 0-15 days of the event date - 100% of the fee will be due.

15.5 Cancellation occurs between 16-30 days of the event date - 75% of the fee will be due.

15.6 Cancellation occurs between 31-60 days of the event date - 50% of the fee will be due.

15.7 For cancellations that occur more than 60 days from the event date, no additional fees will be due to as this is deemed a suitable amount of time for the provider to reallocate work or consultants.

15.8 All client cancellation fees must be paid to the provider within 14 days.

15.9 Any outstanding payment owed to the provider will be referred to a recovery company and will be subject to a 15% surcharge to cover any collection costs incurred. This surcharge together with all other charges and legal fees will be the responsibility of the defaulting party and will be legally enforceable.

15.10 Force Majure may not automatically apply, including failure is as a result of Acts of Nature (including fire, flood, earthquake, storm, hurricane or other natural disaster), war, terrorist activities, death, illness or other incapacity certified by a properly qualified medical practitioner, epidemic, accident, civil commotion, order of Government or Local Authority having jurisdiction in the matter or changes in law.

15.11 Any party asserting Force Majeure so as to negate liability shall have the burden of proving it and justifying that they took preventative action wherever possible to counteract the circumstance. Where bookings are not managed appropriately, or where preventative measures are not proven, all cancellation fees will apply.

Accept

Project Acceptance

new logo.png

PROJECT ACCEPTANCE

To accept the costing, objectives and conditions set out in this proposal, please click the button below and complete the questions, followed by a signature. 

An email confirmation will be issued to you as soon as your submission has been processed and submitted to ESS. Please check your spam folder if you have not received confirmation. 

For any other questions, please contact ESS via email at info@ess-consultants.co.uk, or telephone 0843 289 1097, opt 1

bottom of page